Tuesday, July 12, 2016

Steven Sinn: Week 6 DEC

My first week back from my trip has been full of catching up on what I had missed while I was on vacation. A lot of progress has been made in the three weeks three weeks that had gone by so fast. Building AB is in its final stages of erecting steel. Detailing and Decking have also made a lot of progress keeping pace with the building. Building C has been started with pouring grade beams and center cores being formed. A lot of earth work has been done excavating for building C grade beams. I had fun on my trip but I am glad to be back home and back to work. Here are some pictures showing progress on building AB and C.

Here is Building AB with decking installed and being prepped for concrete.
 Here is Building AB where it has been connected to the center core and screen wall is being erected.
 Here is the first floor of Building AB this shows how far the building stretches alongside the arena.
 Here is a picture of Cores being formed for building C And some of the excavation that goes around them.
 

No comments:

Post a Comment